«  01  02  03  »

East Riverside Corridor Study, Austin, TX 
As part of a City of Austin Transportation Corridor Improvement Project, McCann Adams Studio worked with HDR Engineering to design coordinated rail, bicycle, and pedestrian improvements for East Riverside Drive, tansforming the highway environment into a multi-modal boulevard, surrounded by transit-oriented development. In addition to the provision of urban rail, the street includes tree-lined cycle tracks and an intermodal transit station within a major new plaza at the Pleasant Valley Road intersection.

 

© 2010 McCann Adams Studio. All Rights Reserved.  |  Text by CYMK Group  |  Site by Zocalo Design